Height | Date | Notes |
---|---|---|
3.17
|
06-02-2022
|
project staff removed the drifter from the water at 3:30 p.m.
|
3.17
|
06-02-2022
|
project staff remove the drifter at 3:30. Staff reading.
|
3.17
|
06-02-2022
|
project staff put the drifter in the lake at 2:31 p.m.
|
3.10
|
05-31-2022
|
project staff installed gauge
|