Height | Date | Notes |
---|---|---|
1.25
|
06-09-2022
|
|
2.34
|
06-01-2022
|
project staff installed the gauge, survey point is lowest horizontal sealant expansion crack on concrete dyke referenced to 4 5/8" above the 3.30 marker on the gauge
|